| 1, Customer is needed to offer
accurate size of the room and briefly indicate the special
requirement, then sent them to our designing department (fax:
021-58520485). Or it can be measured by our engineers and we
will also discuss with you about its design until the project is
confirmed. |
| |
| 2, Our company will calculate the cost for the
whole project and appoint a project coordinator responsible for
it. |
| |
| 3, After the designing and price of the project
are confirmed, the project coordinator will check the drawing
again and sign the contract with you. |
| |
| 4, We will arrange the production immediately
after the contract is signed. You will be informed the delivery
date by written form three days before the delivery. Customer
must confirm that whether scene is ready after receiving the
notice. If there is no change, the goods will be shipped on
time. |
| |
| 5, In order to guarantee the quality of products
and installation, the installation team led by our project
director will responsible for the whole construction on the
spot. Customer and our project director will confirm the project
and sign jointly after the project is finished. The relative
documents will be put on records. |